Dealership Facade Renovation Main Line Ardmore Philadelphia

Framing for EIFS Exterior. EIFS (Exterior Insulation and Finish System) is a multi-layered exterior wall system that is used on both commercial buildings and homes. It provides superior energy efficiency and offers much greater design flexibility than other cladding products.

Phased Dealership Renovation Service Bay Tile Installation Main Line Ardmore Philadelphia

Inside the service bay, the partition separating Phase I and Phase II has been removed from the center of the facility in preparation for clinker tile installation.

Phased Dealership Renovation Retail Auto Parts Addition Main Line Ardmore Philadelphia

New Retail Auto Parts Location at Drywall Phase



Renovation Phase 2 Underway
April 19, 2010, 3:56 pm
Filed under: Uncategorized

Dealership Renovation Service Bay Phased Construction Main Line Philadelphia

The slab of the second half of the service bay has been excavated, prepped, and poured.

Auto Dealership Service Bay Renovation Phased Construction Main Line Philadelphia

Auto service continues in the newly renovated half of the service bay, visible through the opening in the temporary partition wall.

Auto Dealership Renovation Phased Construction Main Line Philadelphia

Before Renovation: Future site of the Retail Parts area with an opening to the service bay.



Lifts Installed
March 15, 2010, 10:10 am
Filed under: Uncategorized

Dealership Renovation MINI of the Main Line Philadelphia PA

Installation of lifts complete. Notice that the wall separating the two halves of the service bay has been removed, as the transition to renovate the remaining half of the service bay begins.



Clinker Tile Installed
February 26, 2010, 9:12 am
Filed under: Uncategorized

Main Line Mini Dealership Renovation

Dealership Renovation Service Area Main LIne Mini



Clinker Tile Installation in Progress
February 22, 2010, 11:29 am
Filed under: Uncategorized

Dealership Renovation Service Bay Tile Installation Main Line Philadelphia



Floor Tile Installation Begins Today
February 19, 2010, 2:28 pm
Filed under: Uncategorized

Main Line Mini Dealership Renovation

Before Clinker Tile Installation

Dealership Renovation Main Line Philadelphia

Phase 1 floor tile scheduled for completion by March 1.



Rough In Piping
January 28, 2010, 8:35 am
Filed under: Uncategorized

Fire sprinkler, air lines for compressed air. MINI Auto Dealership Renovation Main Line Philadelphia

Fire sprinkler, air lines for compressed air



Concrete is Flowing
January 21, 2010, 11:55 am
Filed under: Uncategorized

Dealership Service Bay Area Construction Main Line Philadelphia

52 yards cast in place in 3 hours 15 minutes.

Dealership Service Bay Renovation Main Line Philadelphia

Concrete testing.

Dealership Service Bay Renovation Main Line Philadelphia

Ambric is on site.



Slab Prep
January 19, 2010, 11:14 am
Filed under: Uncategorized

Dealership Service Area Construction Main Line Philadelphia

Installation of trench drain in the service bay area.

MINI Dealership Renovation on the Main Line Pennsylvania

Prep for casting new concrete slab. Installation of 6 mill plastic and wire welded fabric.

Philadelphia Dealership Renovation Construction



Excavation Before Concrete Slab Floor Poured
January 8, 2010, 5:07 pm
Filed under: Uncategorized

Mini of the Main Line Renovation

Excavation for new floor drains and below slab exhaust system. Preparation for new concrete slab.

Mini of the Main Line Renovation

New mechanical units lifted to roof top location

Mini of the Main Line Dealership Renovation

New floor drain piping