Framing for EIFS Exterior. EIFS (Exterior Insulation and Finish System) is a multi-layered exterior wall system that is used on both commercial buildings and homes. It provides superior energy efficiency and offers much greater design flexibility than other cladding products.
Inside the service bay, the partition separating Phase I and Phase II has been removed from the center of the facility in preparation for clinker tile installation.
New Retail Auto Parts Location at Drywall Phase
Filed under: Uncategorized
The slab of the second half of the service bay has been excavated, prepped, and poured.
Auto service continues in the newly renovated half of the service bay, visible through the opening in the temporary partition wall.
Before Renovation: Future site of the Retail Parts area with an opening to the service bay.
Filed under: Uncategorized
Installation of lifts complete. Notice that the wall separating the two halves of the service bay has been removed, as the transition to renovate the remaining half of the service bay begins.
Filed under: Uncategorized
Installation of trench drain in the service bay area.
Prep for casting new concrete slab. Installation of 6 mill plastic and wire welded fabric.
Filed under: Uncategorized
Excavation for new floor drains and below slab exhaust system. Preparation for new concrete slab.
New mechanical units lifted to roof top location
New floor drain piping